Device 01 / output
Light bank
Main strip
PWM channel / 01
Operations / Control room
One clear surface for lights, relays, and rover movement. Try every command here first, then connect real hardware when your transport layer is ready.
The command deck is ready. Every interaction is timestamped below so you can see exactly what the demo would send.
Devices
03
configured in this deck
Connected
00
awaiting transport
Last command
BOOT
visible in activity
Control deck
Device 01 / output
Main strip
PWM channel / 01
Device 02 / switch
Device 03 / motion
direction pad / local
IDLE
Direction commands are logged locally and remain queued until a transport is connected.
Activity stream
3 events / latest first
Demo session initialized
BOOT
Channel ready
RLY:READY
Standby position
DRV:IDLE
Diagnostics
Transport
No connection
offline
Power
Bench ready
not measured
Command queue
3 events
local history
Interface
Operational
all controls live